The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Where to mount starter strip for vinyl siding.
Add to list click to add item sequoia select double 4 1 2 x 12 1 dutch lap vinyl siding to your list.
This universal starter strip is specific for use with tando products.
Click to add item sequoia select double 4 1 2 x 12 1 dutch lap vinyl siding to the compare list.
This is where the new siding will begin.
When the wall surface is uneven shim out the starter strip to avoid a wavy appearance in the finished siding job.
Nail to wall following nailing instructions in important installation tips.
Compare click to add item sequoia select double 4 1 2 x 12 1 dutch lap vinyl siding to the compare list.
It protects the sheathing from rain snow and pests.
Plywood above this line to hold out the bottom of the first row of siding and nail the starter strip to this plywood.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
In order for the siding to be installed properly in a level fashion the starter strip at the bottom of the wall must be level.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Determine the lowest point of the wall that will be sided.
The manufacturers listed above are not available at all locations.
Vinyl siding starter strips.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Vinyl siding manufacturers we carry.
There are a variety of factors that influence the cost of replacing vinyl siding including the style accessories home size and installation costs.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
From that point measure up 1 4 6 4mm less than the width of the starter strip and partially drive a nail at one corner.
It ensures a straight first row of stone or siding.
Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.
Tando universal starter strip is installed at the base of the house or structure and it is what siding clips into and anchors the stone in place.
Position starter strip with the top edge of chalk line and allow room for corner posts.