Carefully flash the valleys and seams.
Where to start applying asfalt single to your roof.
Bend single tabs or special ridge shingles over the ridge beginning at the end putting a bead of asphalt under the first ridge shingle to hold down the tab.
Do this on both sides of the roof.
Install new flashing metal flashing is often called drip edge along the.
One way is to start at the center and begin laying out the shingles to the left and the right of the centerline working your way toward the rake edge.
Mark 12 inches up on the roof for the first course of shingles then mark every 5 inches all the way up the roof to set your reveal.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Attach with nails along the top edge of the strip.
This material is very easy to install and provides flexibility during its installation process.
Start by laying asphalt felt or other underlayment over the roof.
Rip cut the starter strip or starter pieces so that they butt up against the second course of existing shingles and are even with the front edge of the existing roofing.
To lay out the design for the shingles begin at the bottom of the roof and place a tape measure inch from the edge of the roof to ensure the shingles overhang the drip edge.
If you live in an area with inclement weather you should consider using a special ice and water protector.
Begin at the bottom left corner of a roof surface and work toward the right and upward from the eave line to the peak.
Where several workers are installing shingles one usually begins by installing shingles along the eave overhang while others begin filling in the field working from bottom to top.
2 install the ridge shingles.
The method you follow should depend on the specific directions from your shingle s manufacturer.
Asphalt shingles are commonly used on sloped roofs single homes and smaller residential projects just to name a few.
Regardless of the asphalt shingle type or style you ve chosen the process is basically the same as mentioned earlier you start at the bottom and overlap as you work your way across and up the roof.
Overlap each row at least 3 to 4 inches.
Use a starter strip or cut pieces for a starter course.
Starting at the left the other way is to begin at the far left edge of the roof and go across.
Using your staple gun secure the felt to the roof.